Back Next

HCMAG Home
Overview
Introduction
Getting Started
Problem 1
Problem 2
Problem 3
Problem 4
Problem 5
Problem Index
Datasets
Search

Sub-problem 3b - Page 7 of 10

ID# C403B07

Sub-problem 3b: Ramps

Locations I and J
Our merging analyses focus on locations I and J. Location I involves a single lane on-ramp and a 2-lane freeway. This is a typical situation. The acceleration lane is about a tenth of a mile long and the ramp has a free flow speed of 25 mph.

Location J is about 3-tenths of a mile further downstream. The free flow speed on the ramp is 35 mph. It has a single lane, right-hand on-ramp and a 2-lane freeway, but the on-ramp never ends, making it different from a typical merge location. The on-ramp continues on as a third lane. To study it as a merge, we will do a parametric analysis and vary the length of the effective on-ramp to see what LOS we might expect. The HCM also suggests that we do an analysis of the approach leg and departing freeway capacities. These analyses can be done using the HCM suggested capacities provided in Exhibits 24-3 and 24-7.

We know from capacity analyses in the previous section that the v/c ratio is 0.98 for the I-787 NB/Route 7 WB ramp (Location I) and 0.15 for the I-787 SB/Route 7 WB ramp (Location J) in the PM peak hour. So we may find that the merge at Location I is problematic, while the one at J is not.

Exhibit 4-59.  PM peak hour analysis results at Locations I and J
Location Density
pcpmpl
LOS
I 216 C
 
Location J v/c
On-ramp 0.34
Arriving Freeway 0.54
Departing Freeway 0.46

The analysis results, for the merges at Locations I & J, during the PM peak hour are shown in Exhibit 4-59. What we see is that the merge at Location I is operating at a LOS C. This suggests that although the performance of the ramp itself may be poor (v/c=0.98), the merge is able to accommodate the traffic. At Location J the capacity analysis indicates the merge is well under capacity.

[ Back ] [ Continue ] with Sub-problem 3b