|
Exhibit 1-49. Quick Estimation Summary: U.S.-95 at Palouse River Drive |
|||||||
Direction |
East-West |
North-South |
|
||||
Phase |
1 |
2 |
3 |
1 |
2 |
3 |
|
Movements |
EBWBTH |
SBTHLT |
NBSBTH |
Total |
|||
Critical Volume |
455 |
157 |
354 |
966 |
|||
Computed cycle length in the specified range of 60-120 sec: |
60 |
|
|||||
Critical v/c ratio based on the selected cycle length |
0.71 |
|
|||||
Status: "Under Capacity" |