Exhibit 3-39. Three-Phase Timing Plan Comparison: Krome Avenue and Okeechobee Road

 

QEM Results

(Sub-problem 5a)

Full Operational Analysis

QEM

Timing

Equal v/c

Timing

Equal Delay Timing

Yellow + All Red Time per Phase (sec)

4

4

6

6

Green Time (sec):

WBLT

10.8

10.8

9.7

17.7

EB & WB Through

86.2

86.2

81.8

68.0

NB Through

11.0

11.0

10.5

16.3

v/c ratio

WBLT

 

0.75

0.84

0.46

EB Through

 

0.79

0.83

1.0

NB Through

 

0.79

0.83

0.53

Critical v/c ratio

0.82

0.79

0.83

0.83

Control Delay (sec/veh)

WBLT

 

81

96

52

EB Through

 

13

18

47

NB Through

 

73

76

52

Overall Intersection Delay

 

20.4

24.5

42

Level of Service

WBLT

 

F

F

D

EB Through

 

B

B

D

NB Through

 

E

E

D

Overall Intersection LOS

 

C

C

D