Exhibit 3-39. Three-Phase Timing Plan Comparison: Krome Avenue and Okeechobee Road |
||||
|
QEM Results (Sub-problem 5a) |
Full Operational Analysis |
||
QEM Timing |
Equal v/c Timing |
Equal Delay Timing |
||
Yellow + All Red Time per Phase (sec) |
4 |
4 |
6 |
6 |
Green Time (sec): |
||||
WBLT |
10.8 |
10.8 |
9.7 |
17.7 |
EB & WB Through |
86.2 |
86.2 |
81.8 |
68.0 |
NB Through |
11.0 |
11.0 |
10.5 |
16.3 |
v/c ratio |
||||
WBLT |
|
0.75 |
0.84 |
0.46 |
EB Through |
|
0.79 |
0.83 |
1.0 |
NB Through |
|
0.79 |
0.83 |
0.53 |
Critical v/c ratio |
0.82 |
0.79 |
0.83 |
0.83 |
Control Delay (sec/veh) |
||||
WBLT |
|
81 |
96 |
52 |
EB Through |
|
13 |
18 |
47 |
NB Through |
|
73 |
76 |
52 |
Overall Intersection Delay |
|
20.4 |
24.5 |
42 |
Level of Service |
||||
WBLT |
|
F |
F |
D |
EB Through |
|
B |
B |
D |
NB Through |
|
E |
E |
D |
Overall Intersection LOS |
|
C |
C |
D |