Sub-problem: Analysis of the Signal with Pedestrians and Bicycles

A table to illustrate the total delay comparison table with the improved geometry and additional considerations is presented below.

Table 12. Improved Museum at Reitz comparing TWSC and Signal Control

 

EB

WB

NB

SB

L

T

R

L

T

R

L

T

R

L

T

R

Volume

379

670

2

0

597

178

0

0

0

204

0

484

Delay TWSC

30.4

0

-

-

0

0

-

-

-

999

-

999

Delay Signal

218.6

17.8

-

-

21.9

21.9

-

-

-

30.6

-

33.1

Total Delay TWSC

11,522

0

19,980

687,312

Total Delay Signal

60568

16,973

0

22,291

Intersection Delay

TWSC

718,814

Signal

99,832

Difference

618,982 (86%)

We have successfully shown that in this case, the signal control out-performs the TWSC even more (86% reduction in total delay) with the improved geometry.

Note that both the signalized and TWSC procedures assume adequate left-turn and through movement storage when computing delay. This means that these procedures do not account for left-turn queues that might exceed the provided storage and interfere with the through movements. The procedure is also treating the intersection as isolated and will not account for through movement queues that could spillback into adjacent intersection queues. We will look at how to compute and compare interacting queues in Problem 5.

[ Back ] [ Continue ] to Problem 2