Back Next

HCMAG Home
Overview
Introduction
Getting Started
Problem 1
Problem 2
Problem 3
Problem 4
Problem 5
Problem Index
Datasets
Search

Sub-problem 2d - Page 3 of 7

ID# C402D03

Sub-problem 2d: How Can We Improve the Level of Service at the Ramp Junction at the Northbound On-Ramp to I-87?

Step 2. Results

Exhibits 4-32 and 4-33 show the impact of adding a lane to the freeway mainline. Exhibit 4-32 shows the input data while Exhibit 4-33 shows the output data produced from the HCM analysis.

Exhibit 4-32.
Additional Lane  on Freeway Mainline Input Data

Freeway data AM Peak PM Peak
Dataset 19 Dataset 20
Number of lanes, N 4
Free flow speed, SFF 55
Volume 1,000 4,800
Ramp data AM Peak PM Peak
Ramp volume 765 1,900
Number of lanes on-ramp, N 1
Length of acceleration lane, LA 500

 

Exhibit 4-33.
Additional Lane  on Freeway Mainline Output Data

Output data AM Peak PM Peak
PFM 0.24 0.08
V12, pc/h 261 415
VFO actual 1,957 7,444
VFO maximum 9,000 9,000
VR12 actual 1,109 2,526
VR12 maximum 4,600 4,600
Density, pc/mi/lane 10.6 21.1
LOS for ramp-freeway junction area of influence B C
Speed-ramp influence area, mph 51.3 50.8
Speed-outer lanes, mph 55.0 47.5
Speed-all vehicles, mph 52.8 48.6

After reviewing the output data shown in Exhibit 4-33, consider the following questions:
bullet

What is the most significant change in the performance of the merge area as a result of the addition of the lane to the freeway mainline?

bullet

Does the addition of the lane produce acceptable performance of the merge area?

Discussion:
Take a few minutes to consider these questions. When you are ready, continue to the next page.

[ Back ] [ Continue ] with Sub-Problem 2d