Sub-problem 2d - Page 2 of 7

ID# C402D02

Sub-problem 2d: How Can We Improve the Level of Service at the Ramp Junction at the Northbound On-Ramp to I-87?

We will explore three possible mitigation options in this sub-problem: adding a lane to the freeway mainline; adding a lane to the ramp; and lengthening the acceleration lane. Each of these mitigations requires minor changes in the input data. If we add a lane to the freeway mainline, one parameter change is required: the number of lanes on the freeway mainline. If we add a lane to the ramp, again, one parameter change is required: the number of lanes on the ramp. Similarly, if we change the length of the acceleration lane, this parameter must be modified.

In the next several pages, we will consider the results of these parameter changes. You can follow the solutions and relevant discussion for each of these three changes through the links below:

Adding a lane to the freeway mainline

Adding a lane to the ramp

Lengthening the acceleration lane

 [ Back ] [ Continue ] with Sub-Problem 2d