Back Next

HCMAG Home
Overview
Introduction
Getting Started
Problem 1
Problem 2
Problem 3
Problem 4
Problem 5
Problem Index
Datasets
Search

Sub-problem 4b - Page 3 of 6

ID# C404B03

Sub-problem 4b: Off-Peak Operational Analysis of Alternate Route 7

Step 2. Results

The HCM freeway facility analysis produces a sizable amount of data. Exhibits 4-67 and 4-68 provides a summary of some of the key output data for the eastbound and the westbound sections respectively.

Exhibit 4-67. Eastbound Freeway Facility Analysis

Eastbound Facility

S01

S02

S03

S04

S05

S06

S07

S08

S09

S10

S11

Type (B,W, ONR,OFR)

B

W

B

ONR

B

B

OFR

B

ONR

ONR

B

Length (ft)

3,675

670

1,025

775

1,890

10,900

1,500

3,100

1,115

1,500

2,000

Number of lanes

2

4

2

4

3

2

2

2

2

4

4

Free flow speed (mph)

55

55

55

55

55

55

55

55

55

55

55

Speed (mph)

55.0

27.9

48.1

53.4

54.8

55.0

49.9

54.9

50.8

54.5

55.0

Density (veh/mi/ln)

10.0

35.3

7.6

10.8

14.4

21.6

21.8

13.7

17.8

15.0

14.8

Segment Capacity (vph)

4,375

4,100

4,375

8,750

6,565

4,375

4,375

4,375

4,375

8,750

8,750

Segment Demand (vph)

1,095

3,930

895

2,540

2,540

2,540

2,540

1,610

1,890

3,365

3,365

Segment Volume (vph)

1,095

3,930

895

2,540

2,540

2,540

2,540

1,610

1,890

3,365

3,365

d/c ratio

0.25

0.96

0.20

0.29

0.39

0.58

0.58

0.37

0.43

0.38

0.38

v/c ratio

0.25

0.78

0.17

0.27

0.36

0.54

0.54

0.34

0.41

0.37

0.37

On-Ramp Demand (vph)

2,835

1,645

280

1,470

On-Ramp Volume (vph)

2,100

1,645

280

1,470

On-Ramp Delay (veh-hrs of delay)

23

0

0

On-Ramp Queue Length (ft)

22,000

0

0

0

Off-Ramp Demand (vph)

3,035

930

Off-Ramp Volume (vph)

2,470

865

Vehicle LOS

B

E

A

B

B

C

C

B

B

B

B

[ Back ] [ Continue ] with Sub-Problem 4b