ID# C101B05

Sub-problem 1b: Analysis of the Proposed Signalized Intersection

Step 2. Results

When we apply the methods of chapter 16 of the HCM, we obtain estimates of capacity, v/c ratio, queue length, delay, and level of service for each lane group. In addition, capacity, delay, and level of service are produced for each approach. Also, the delay and level of service are produced for the intersection as a whole.

The results from this calculation are summarized in Exhibit 1-11 for the existing volumes and signalized intersection control.

Exhibit 1-11. U.S. 95/Styner-Lauder Avenue (Dataset2)
Lane Group Capacity, Control Delay, and LOS Determination - Existing Volumes (Signal Control)

  EB WB NB SB
LT TH/RT LT TH/RT LT TH/RT LT TH/RT
Adjusted flow rate 50 155 55 205 31 407 59 557
Lane group capacity 276 438 313 432 491 2,067 569 2,012
v/c ratio 0.18 0.35 0.18 0.47 0.06 0.20  0.10 0.28 
95% queue length 1.6 4.8 1.8 6.3 0.6 3.9 1.1 5.4
Green ratio 0.25 0.25 0.25 0.25 0.58 0.58 0.58 0.58
Control delay 19.0 20.7 18.9 22.9 5.7 6.1 5.9 6.6
Lane group LOS B C B C A A A A
Approach delay 20.3 22.0 6.1 6.5
Approach LOS C C A A
Intersection delay 10.9 Intersection LOS B
Critical v/c ratio 0.34

Discussion:
Take a few moments to reflect on the analysis results presented in this table and consider the performance measures most relevant to an assessment of the overall operational characteristics of the signalized intersection. Click on continue when you are ready to proceed.