Problem 2 - Page 3 of 3 |
ID# C20AN01 |
Problem 2: Moe Road
Analysis Plans
A number of interesting
issues could be explored at this intersection. As
Exhibit 2-3 indicates, we will examine pedestrian flows using the
AM Existing condition and lane utilization using the PM With
condition. In the case of pedestrian flows, we’re going to look at impacts
on delay and signal timing. In the case of lane utilization, we will see
how lane utilization is defined, describe how to compute a lane
utilization coefficient, see how to incorporate it into the analysis, and
explore sensitivity issues related to its numerical specification.
Discussion:
Moe Road is an
intersection that needs to be analyzed comprehensively. Consider loading the
problem dataset into your HCM software to study the intersection closely.
[ Back ] [
Continue ]
to Sub-Problem 2a