ID# C203A06

Sub-problem 3a: Shenendehowa Campus AM & PM peak - Existing Conditions

Exhibit 2-32 shows the results of our sensitivity analysis for the PM Existing condition. The overall delay doesn’t change very much. It ranges from 19.4 sec/veh up to 24.1. The delays for the individual movements are similar except for the eastbound left-through. It varies from 20.2 to 31.1 sec/veh. That’s a 50% change.

Exhibit 2-32. Shenendehowa Campus PHF Sensitivity Analysis for the PM peak hour 
Time Period PHF Condition Performance Measure EB WB NB SB OA
L T R Tot L T R Tot L T R Tot L T R Tot

PM

Overall

Delay

27.2

7.9

25.5

23.9

14.5

15.6

18.7

21.69

20.5

16.2

16.2

21.3

LOS

C

A

C

C

B

B

B

C

C

C

B

C

PM

By Movement

Delay

31.3

8.5

29.0

28.6

17.7

19.0

20.0

29.2

26.2

17.3

17.3

24.1

LOS

C

A

C

C

B

B

B

C

C

B

B

C

PM

Interval
16:00-16:15

Delay

31.1

9.4

28.9

27.8

15.0

16.8

19.4

26.2

23.9

16.9

16.9

23.0

LOS

C

A

C

C

B

B

B

C

C

B

B

C

PM

Interval 16:15-16:30

Delay

21.6

9.5

20.5

27.2

16.3

17.4

20.8

24.0

23.0

19.4

19.4

19.4

LOS

C

A

C

C

B

B

C

C

C

B

B

B

PM

Interval
16:30-16:45

Delay

29.8

9.1

27.7

31.0

13.6

16.0

22.1

26.6

24.9

20.4

20.4

22.3

LOS

C

A

C

C

B

B

C

C

C

C

C

C

PM

Interval
16:45-17:00

Delay

20.2

9.5

19.5

29.3

17.1

18.3

24.6

24.2

24.4

21.9

21.9

19.6

LOS

C

A

B

C

B

B

C

C

C

C

C

B

Discussion:
Consider the table shown above. These analyses show variations in results that were obtained by making slightly different assumptions and using different inputs for the peak hour factor.

Back ] Continue ] with Sub-problem 3a