Back Continue

HCMAG Home
Overview
Introduction
Getting Started
Problem 1
Problem 2
Problem 3
Problem 4
Problem 5
Problem 6
Problem Index
Datasets
Search

 

Sub-problem 4b - Page 1 of 5

ID# C204B01

Sub-problem 4b: Clifton Country Road PM peak hour - Existing Conditions

We could examine many issues based on the PM Existing conditions. A few are lane utilization, coordination, lane groups, lost time, critical movements, signal timing, and queue length. Of these, we have examined lost time or right turns on red. We will use the PM Existing condition to look at these two issues as well as the difference between demand and volume.

Analyses:

Lost Time

Demand vs. Volume

Right Turns On Red

  Back ] Continue ] to Sub-problem 4b