Sub-problem 4b: Clifton Country Road PM peak hour - Existing Conditions
We could examine many issues based on the PM Existing conditions. A
few are lane utilization, coordination, lane groups, lost time, critical
movements, signal timing, and queue length. Of these, we have
examined lost time or right turns on red. We will
use the PM Existing condition to look at these two issues as well
as the difference between demand and volume.Analyses:
Lost
Time
Demand
vs. Volume
Right
Turns On Red
[ Back ] [ Continue ]