Problem 5: Interstate 87 Interchange
Discussion
What have we learned from this problem? Maybe
the most important thing we’ve learned, in the context of the case study,
is that the interchange is adequate with the site-generated
traffic, except for the southbound-to-westbound off-ramp and the westbound
left onto the southbound on-ramp.
In
the context of the HCM procedures, we’ve seen how a variety of methods
can be used to explore the performance of specific locations within the
interchange. We’ve applied merge and diverge analyses to the major ramp
terminals, we’ve done a weaving analysis of the eastbound section of
highway between the two loop ramps, and we’ve used the unsignalized
intersection analysis methodology to assess the performance of two
unsignalized junctions.