Subproblem 3b - Page 5 of 6 |
ID# C303B05 |
Sub-problem 3b: Operational
Analysis of the Center Section of Krome Avenue (Class I or II Two-Lane
Highway Facility)
The
decision on class designation rests solely with the operating agency. The
purpose of this Guide is to point out the factors that should be taken into
consideration and their relationship to the HCM procedures. Therefore, the
question of whether this portion of Krome Avenue should be a Class I or II
facility will remain open.
Before we leave this
sub-problem, we should take a look at how the operational analysis results
compared with the service volume table results from
sub-problem 2b. The comparison is
evident in
Exhibit 3-20. The bottom line is that, for a Class I facility the same estimation
of LOS was produced by both procedures. While the LOS was improved for a
Class II facility for the reasons just stated, it is not possible to compare
this result with the service volume tables, because those tables are limited
in scope to Class I facilities.
One last point: the
base free flow speed was adjusted upwards to produce the same actual free
flow speed used in the service volume tables to facilitate the comparison of
the planning and operational level analyses. This topic was explained in
detail in
sub-problem 3a. The amount
of the adjustment in this case was 3.1 mph, resulting in a base free flow
speed of 53.1 mph in the table on the previous page.
[
Back ] [ Continue
] with Sub-Problem 3b