Sub-problem 3c: Operational
Analysis of the South Section of Krome Avenue (Class I Signalized Arterial
Facility)
Step 1. Setup
In this sub-problem, we will replace the
assumptions used in our planning analysis with field data. We will
then compare the results of the HCM planning analysis to the results of the
operations analysis. Based on assumptions made in the planning analysis of problem 2 versus the
actual conditions of Krome Avenue described in this case study, do you think
the results of the two analyses will be similar? Better or worse?
Consider:
|
What additional data will
be applied in the operations procedure?
|
| What are the factors that are used to determine urban
street LOS? |