Sub-problem 3c: Operational Analysis of the South Section of Krome Avenue (Class I Signalized Arterial Facility)

Step 1. Setup

In this sub-problem, we will replace the assumptions used in our planning analysis with field data. We will then compare the results of the HCM planning analysis to the results of the operations analysis. Based on assumptions made in the planning analysis of problem 2 versus the actual conditions of Krome Avenue described in this case study, do you think the results of the two analyses will be similar? Better or worse?

Consider:

bullet

What additional data will be applied in the operations procedure?

bulletWhat are the factors that are used to determine urban street LOS?

Discussion:
Take a few minutes to consider these questions. Click continue when you are ready to proceed.

[ Back ] to Sub-Problem 3b [ Continue ] with Sub-Problem 3c