Step 1. Setup
The analyses conducted
at Krome Avenue and Okeechobee Road to this point have treated the
northbound right turn as a stop-controlled movement. As shown in the
previous problem, this results in an estimated capacity that anticipates a
failing condition. Closer
inspection of the assumption reveals that this may be too conservative and
that it should be considered as a merge. As shown in the aerial photograph of
Exhibit 3-24 and in Exhibit 3-32, below, the right-turn channelization is designed more as a merge
than a conventional intersection.
Exhibit 3-32. Northbound Right Turn Site Photograph
Consider:
|
What HCM procedure might be employed to consider the
operations of this location? |
| What is the basis for determining LOS in the
unsignalized intersections methodology? |
Discussion:
Take
a few minutes to consider these questions. Click continue when you are
ready to proceed. [
Back ] to Sub-Problem 4c [
Continue ] with Sub-Problem 4d |